1. A. I. Karachev, I. V. Budakov, and V. S. Rabenko, “About Some Results Gained from the Operation of Modern Russian Combined-Cycle Power Plants,” Nadezhn. Bezop. Energ., No. 2, 19–24 (2008).
2. V. F. Gutorov, Yu. A. Radin, A. V. Davydov, et al., Results Obtained from the Operation Adjustment Works and Tests Carried Out on the Thermal Equipment of the PGU-39 Units at the Sochi Thermal Power Station (VTI, Moscow, 2004) [in Russian].
3. R. Franke, M. Rode, and K. Kruger, “On-Line Optimization of Drum Boiler Startup,” in Proceedings of the 3rd International Modelica Conference, Linkoping, November 3–4, 2003, pp. 287–296.
4. V. A. Dvoinishnikov and E. A. Popov, “Studying the Effect the Initial Thermal State of a Heat-Recovery Boiler’s Evaporating System Has on Its Performance Characteristics During Startup,” Teploenergetika, No. 4, 29–35 (2010) [Therm. Eng., No. 4 (2010)].