1. V. A. Dvoinishnikov and E. A. Popov, “Specific features of the stressed state arising in the high-pressure drum of a combinedcycle plant’s heat-recovery boiler during its startup,” Therm. Eng., 58(8), 634 – 640 (2011).
2. K. A. Pleshanov, I. L. Ionkin, P. V. Roslyakov, R. S. Maslov, A. V. Ragutkin, and O. E. Kondrat’eva, “Combustion of bark and wood waste in the fluidized bed boiler,” Therm. Eng., 63(11), 813 – 818 (2016).
3. RD 34.20.501–95. Operating Rules and Regulations for Power Plants and Grids of the Russian Federation [in Russian], order No. 229 of the Ministry for the Power Generating Industry of Russia of 6/19/2003, DEAN, St. Petersburg (2012).
4. V. I. Trembovlya and I. M. Meksin (eds.), Experience of Starting up and Operating 150 MW Units of the Pridneprovskaya TPP in 1960 and 1961 [in Russian], ORGRÉS, Moscow (1962).
5. RD 34.25.511. Typical Instructions on Start-up from Different Thermal States and Shutdown of a 200 MW Power Unit with a Turbine and a TP-100 Boiler (for Control of Power System Load) [in Russian], SPO ORGRÉS, Moscow (1977).