Affiliation:
1. Voronezh State University of Forestry and Technologies named after G.F. Morozov
Abstract
The guiding principles of project implementation are planning. The discrepancy in time, cost, and quality between the plan and the actual implementation of the project requires management decisions supported by an analysis of the optimization of the duration of the project and the search for reserves to reduce the implementation time. For this purpose, a basic PERT model for a specific project was developed, early and late deadlines for work, time reserves, and a critical path were calculated. This work is aimed at applying methods of evaluation and analysis of projects to find optimal solutions and control the efficiency of time and costs in project planning, by varying the work on the project and the executors of the work. The results of this study showed that there are quite large time reserves for works 5-7, 7-9, 6-9, etc., which makes it possible to redistribute work between performers and allows you to vary performers during the implementation of several projects simultaneously.
Publisher
Infra-M Academic Publishing House
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. FEATURES OF INTELLIGENT SUPPORT FOR AUTOMATION OF PRODUCTION PROCESSES;Materials of the All-Russian Scientific and Practical Conference of Students and Young Scientists and the All-Russian Scientific and Practical Conference of Lecturers and Specialists "MODERN ISSUES OF AUTOMATION, ROBOTICS AND MANAGEMENT IN TECHNICAL, ORGANIZATIONAL, ECONOMIC SYSTEMS";2024-07-10
2. Mathematical model of intermodal cargo transportation;Modeling of systems and processes;2024-06-28
3. Technical monitoring of objects in the zone of new construction influence;AIP Conference Proceedings;2024
4. Computer-aided design of the location of wireless cellular base stations;Modeling of systems and processes;2023-12-18
5. Algorithm for analyzing the customer base of a trade organization;Modeling of systems and processes;2022-04-08