Abstract
AbstractThis article deals with the comparative analysis of current cable force monitoring techniques. In addition, the experience of three cable stress monitoring techniques during the construction phase is included: (a) the installation of load cells on the active anchorages of the cables, (b) the installation of unidirectional strain gauges, and (c) the evaluation of stresses in cables applying the vibrating wire technique by means of the installation of accelerometers. The main advantages and disadvantages of each technique analysed are highlighted in the Construction Process context of the Tajo Viaduct, one of the most singular viaducts recently built in Spain.
Funder
Horizon 2020 Framework Programme
Publisher
Springer Science and Business Media LLC
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献