Abstract
AbstractThis paper introduces new contributions for construction procedures designed to enhance the robustness and precision of stress control in active anchorage and short presetressing units for long-span bridges, particularly addressing potential technical risks. The primary focus is on optimizing stress management for bridge stays, suspension cables, and short prestressing units by emphasizing a unified parameter: stress. The contributions of this research encompass (1) the introduction of advanced load cells for stress control in active anchorages and (2) the implementation of a novel synchronized multi-strain gage load cell network for short prestressing units, crucial in situations where prestressing losses can attain significant magnitudes. To validate these advancements, the authors present (3) a practical experience and results obtained from applying these methodologies in monitoring the structural response during the construction of the Tajo Bridge using the cable-stayed cantilever technique.
Funder
HORIZON EUROPE Framework Programme
Publisher
Springer Science and Business Media LLC
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献