Abstract
We study the problem of preemptive scheduling of jobs in a two-machine open shop. Jobs require processing on both machines, but the order does not matter. We define the D-LERPT (double longest expected remaining processing time) policy as the policy that first processes jobs that have not yet been processed by either machine (double jobs), in decreasing order of expected remaining processing times, and then processes jobs that require processing on only one machine in any order. We show that D-LERPT stochastically minimizes the makespan when preemption is not permitted and jobs (but not machines) are stochastically identical, and that D-LERPT minimizes the makespan in the increasing convex sense when preemption is permitted and the machines are stochastically identical and processing times are exponential or geometric with a job dependent rate.
Publisher
Cambridge University Press (CUP)
Subject
Statistics, Probability and Uncertainty,General Mathematics,Statistics and Probability
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献