Comparison of predicted and actual states in tunnels: lessons to be learned from the Gerede Water Transmission Tunnel, Turkey

Author:

Apaydin Ahmet1ORCID

Affiliation:

1. Department of Civil Engineering, Giresun University, 28200 Giresun, Turkey

Abstract

The Gerede Tunnel is a large inter-basin project in Turkey. As with many long tunnels, some of the predictions in the project report and the tender contract have not been realized. Completion of the tunnel has been delayed for more than twice the time given in the tender contract. Unexpectedly complex geological–tectonic–hydrogeological conditions and the selection of tunnel-boring machines (TBMs) are the main reasons for this long delay. There were some discrepancies between the predicted and actual geology. The groundwater pressure encountered was much higher than expected. Plastic clays in the limestone and breccia and loose agglomerates with a high water pressure in the faults decreased the advance rate and led to several long stoppages. One of the three double-shield TBMs became stuck in the tunnel and could not be recovered. The last quarter of the tunnel was excavated more slowly, but without severe problems, by a modified earth pressure balance shield TBM. As a result, the TBM type, drive direction, length, route, cost and completion date of the Gerede Tunnel have all changed.

Publisher

Geological Society of London

Subject

Earth and Planetary Sciences (miscellaneous),Geology,Geotechnical Engineering and Engineering Geology

Reference27 articles.

1. Aguilar-Téllez, M.A. , Rangel-Núñez, J.L. , Comulada-Simpson, M. , Auvinet-Guichard, G. , Méndez Marroquin, R. and Maidl, U. 2012. Mexico City deep eastern drainage tunnel, In: Geotechnical Aspects of Underground Construction in Soft Ground, Taylor & Francis Group, London, 1.

2. Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey;Alp;Tunnelling and Underground Space Technology,2019

3. Water inflow into tunnels: assessment of the Gerede Water Transmission Tunnel (Turkey) with complex hydrogeology;Apaydin;Quarterly Journal of Engineering Geology and Hydrogeology,2019

4. Water ingresses and their effects on the advance rate of the tunnel Gerede, which is the longest of Turkey [in Turkish];Apaydın;DSI Teknik Bülteni,2019

5. Bahadorbeygi, D. , Ranasooriya, J. and Nikraz, H. 2009. Predicted and actual conditions of the Namroud Project Diversion Tunnel. In: ISRM Regional Symposium – EUROCK 2009, 29–31 October, Cavtat, Croatia, 5, conference paper ID ISRM-EUROCK-2009-096, International Society for Rock Mechanics and Rock Engineering.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3