Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey

Author:

Alp Murat,Apaydin Ahmet

Publisher

Elsevier BV

Subject

Geotechnical Engineering and Engineering Geology,Building and Construction

Reference14 articles.

1. Holmøy, K.H., 2008. Significance of geological parameters for predicting water leakage in hard rock tunnels. Doctoral Theses at NTNU, 2008:291, Norwegian University of Science and Technology, İSBN 978-82-471-1283-0 (printed ver.) İSBN 978-82-471-1284-7 (electronic ver.).

2. Iseman, M., 2016. Use of two novel hybrid-type “Crossover” TBMs for hard rock conditions with water inflows. In: ITA-AITES World Tunnel Congress 2016 (WTC 2016), San Francisco, California, USA 22–28 April, vol. 1, pp. 494–504.

3. Water-inrush mechanism during construction and determination of safety distance from the water source in a karst tunnel;Jun;EJGE,1982

4. Analysis of water leakage at Lower Kihansi Hydropower Plant System in Tanzania, East Africa;Kassana,2003

5. Discussion and solution of the TBM trapped in the westbound hseuehshan tunnel;Lin,2005

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3