Patterns, drivers, and a predictive model of dam removal cost in the United States

Author:

Duda Jeffrey J.,Jumani Suman,Wieferich Daniel J.,Tullos Desiree,McKay S. Kyle,Randle Timothy J.,Jansen Alvin,Bailey Susan,Jensen Benjamin L.,Johnson Rachelle C.,Wagner Ella,Richards Kyla,Wenger Seth J.,Walther Eric J.,Bountry Jennifer A.

Abstract

Given the burgeoning dam removal movement and the large number of dams approaching obsolescence in the United States, cost estimating data and tools are needed for dam removal prioritization, planning, and execution. We used the list of removed dams compiled by American Rivers to search for publicly available reported costs for dam removal projects. Total cost information could include component costs related to project planning, dam deconstruction, monitoring, and several categories of mitigation activities. We compiled reported costs from 455 unique sources for 668 dams removed in the United States from 1965 to 2020. The dam removals occurred within 571 unique projects involving 1–18 dams. When adjusted for inflation into 2020 USD, cost of these projects totaled $1.522 billion, with per-dam costs ranging from $1 thousand (k) to $268.8 million (M). The median cost for dam removals was $157k, $823k, and $6.2M for dams that were< 5 m, between 5–10 m, and > 10 m in height, respectively. Geographic differences in total costs showed that northern states in general, and the Pacific Northwest in particular, spent the most on dam removal. The Midwest and the Northeast spent proportionally more on removal of dams less than 5 m in height, whereas the Northwest and Southwest spent the most on larger dam removals > 10 m tall. We used stochastic gradient boosting with quantile regression to model dam removal cost against potential predictor variables including dam characteristics (dam height and material), hydrography (average annual discharge and drainage area), project complexity (inferred from construction and sediment management, mitigation, and post-removal cost drivers), and geographic region. Dam height, annual average discharge at the dam site, and project complexity were the predominant drivers of removal cost. The final model had an R2 of 57% and when applied to a test dataset model predictions had a root mean squared error of $5.09M and a mean absolute error of $1.45M, indicating its potential utility to predict estimated costs of dam removal. We developed a R shiny application for estimating dam removal costs using customized model inputs for exploratory analyses and potential dam removal planning.

Publisher

Frontiers Media SA

Subject

Ecology,Ecology, Evolution, Behavior and Systematics

Reference74 articles.

1. AadlandL. Reconnecting rivers: natural channel design in dam removals and fish passage2010

2. American Rivers dam removal database;Figshare,2023

3. Impacts of current and future large dams on the geographic range connectivity of freshwater fish worldwide;Barbarossa;Proc. Natl. Acad. Sci.,2020

4. Rethinking refuges: implications of climate change for dam busting;Beatty;Biol. Conserv.,2017

5. Status and trends of dam removal research in the United States;Bellmore;Wiley Interdiscip. Rev. Water,2017

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3