Digital technologies and data-driven delay management process for construction projects

Author:

Radman Kambiz,Jelodar Mostafa Babaeian,Lovreglio Ruggiero,Ghazizadeh Eghbal,Wilkinson Suzanne

Abstract

One of the main challenges of construction projects is managing delays; there is still a lot to overcome to reach near-zero delays (mitigation of delays) in all construction projects. Technology and different platforms are applied to support a high volume of data flow acquired from multiple resources during the construction project life cycle; how can these automated and digital progress tracking systems be considered for more effective construction delay management? The aim is to investigate the current state of real-time technologies and their applications and assess how specific attributes of these disruptive technologies can significantly alter delay management in construction industries. Therefore, this study presents a new process-based framework for using technologies with a data lifecycle viewpoint. This research uses a four-step systematic literature review involving identification, screening, extortion-eligibility check, and selection-inclusion. Furthermore, it is followed up by a thematic content analysis on using new technologies to mitigate delays in construction projects. Key trends, themes, areas of concern for research, and limitations identified in previous literature as research gaps and future needs were documented and structured. This work presents a novel process of comprehensive classification of real-time technologies that are being used in the construction industry to acquire data, screen/analyses data, and present information through an Industry 4.0 application: IoT technologies such as sensors, RFID etc., smartphones, planning/scheduling tools (Ms Project, Primavera), and Building Information Modelling (BIM). The developed process-based framework is served as a roadmap to 1) centralise real-time communication between technologies to collect, analysis and presentation data in construction phase, 2) prepare timely reports for project managers to take proper action against those problems delaying project.

Publisher

Frontiers Media SA

Subject

Urban Studies,Building and Construction,Geography, Planning and Development

Reference175 articles.

1. AbdelrehimM. S. University of WaterlooInteractive voice-visual tracking of construction as-built information2013

2. A virtual and an augmented reality application of the Rashid Agha's diwakhana in the citadel of erbil using 360° 3D Lidar;Agha,2019

3. A literature review of the history and evolution of corporate social responsibility;Agudelo;Int. J. Corp. Soc. Responsib.,2019

4. Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty;Ahmad;Autom. Constr.,2018

5. TLS for generating multi-LOD of 3D building model;Akmalia;IOP Conf. Ser. Earth Environ. Sci. IOP Publ.,2014

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3