Abstract
When a traffic tunnel passes through special strata such as soft rock with high geo-stress, expansive rock, and fault fracture zones, the traditional supporting structure is often destroyed due to complicated loads, which threatens the construction and operation safety of tunnel engineering. Concrete-filled steel tubular (CFST) structure gives full play to the respective advantages of steel and concrete and has better bearing capacity and economic benefits than traditional support structure, which has achieved good results in some underground engineering applications. In order to promote the application of CFST in the construction of traffic tunnels with complex geological conditions and improve the bearing capacity of the initial supporting structure of tunnels, the influencing factors of the bearing capacity of CFST arch were studied by numerical simulation. The main achievements are as follows: (1) The load-displacement curves of CFST members under different material parameters are basically consistent. CFST members have significant restrictions on displacement in the elastic stage and have high ultimate bearing capacity. Although the bearing capacity decreases obviously after reaching the peak, it shows good extension performance. (2) The height of the steel tube section, the thickness of the steel tube wall and the grade of the core concrete have an approximately linear positive correlation with the bearing capacity of CFST arch, but the influence of these three factors on the bearing capacity of CFST arch decreases in turn, and when the grade of core concrete increases above C50, it has no significant effect on the bearing capacity of members.
Subject
Physics and Astronomy (miscellaneous),General Mathematics,Chemistry (miscellaneous),Computer Science (miscellaneous)
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献