Study on the Reducing Measures to Reduce the Influence of Culvert Extension on Existing Lines in Loess Regions

Author:

Zhao Wenhui1,Zhang Ke1,Han Feng1ORCID,Wang Dingshun1

Affiliation:

1. School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China

Abstract

Due to the many constraint conditions, construction difficulties, and high control standards, and the impact of new line construction on existing lines, the construction of culvert extensions in widened sections of loess areas has become a form of control in railway construction projects. This work analyzes the technical difficulties of culvert extension construction schemes based on a practical engineering case. A scheme to provide culvert protection against slight disturbances is determined, and the construction schemes of the culvert extension structure and transition section filling are optimized. The rationality of culvert extension control measures and the influence of construction on the existing line are then studied based on the monitoring data for each stage. The results show that the implementation of the slight disturbance culvert protection has little influence on the existing line, and has the greatest influence during steel sheet pile construction (<0.5 mm). We symmetrically construct the culvert extension structures (transverse) and transition section filling (longitudinal and transverse) to effectively reduce the influence of differences in the deformation value between the two sides of the existing line at the same level as the existing line. The deformation of the upper side of the culvert fluctuates with the construction of the composite foundation and shows an overall upward trend, while the deformation increases first and then decreases in the transition section, and the deformation of the upper side of the culvert is larger than that of the transition section. The level gauge deformation of each side decreases abruptly at the filling stage of the bottom plate, side plate, top plate, and splayed wall. The settlement value of the level gauge of each station increases nonlinearly with the increase in the filling height of the transition section, and the settlement variation value of the transition section at each filling stage is higher than that of the upper side of the culvert.

Funder

the Gansu Youth Science and Technology Fund project

the Special Funds for Guiding Local Scientific and Technological Development by The Central Government

the Lanzhou Jiaotong University youth science foundation project

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3