A Critical Investigation on the Reliability, Availability, and Maintainability of EPB Machines: A Case Study

Author:

Koohsari Ali,Kalatehjari RoohollahORCID,Moosazadeh SayfoddinORCID,Hajihassani MohsenORCID,Van Bao

Abstract

Tunnelling is a vital geotechnical engineering feature of underground transportation systems that is potentially hazardous if not properly investigated, studied, planned, and executed. A reliability, availability, and maintainability (RAM) analysis is one of the main practical techniques in machinery-based projects to recognize the failure and repair rates of machines during or after their operations. RAM analysis of mechanized tunneling can help to manage the project safety and cost, and improve the availability and performance of the machine. There are several methods to obtain and predict the RAM of a system, including the Markov chain simulation and other statistical methods; however, the result of the analysis can be affected by the selected method. This paper presents the results of a critical investigation on the RAM of the Earth pressure balance machines (EPBMs) used in developing an urban metro project in Isfahan, Iran. The five kilometer length of the first line of the Isfahan metro project was excavated using EPBMs over four years. After overhauling the EPBMs and making some minor changes, excavation of the second line started, and to date, about 1.2 km has been excavated by the refurbished machines. In the present study, a RAM analysis has been applied to electrical, mechanical, and cutter head subsystems of the EPBMs in Lines 1 and 2 of the Isfahan metro project over an 18- and 7-month period of machine operation, respectively. The results show that the estimated availability, A(t), determined by the Markov method, is closer to reality but cannot be propagated to reliability R(t) and maintainability M(t) analysis. It was also revealed that by predicting the required maintenance and proper planning, the overall availability of the EPBM was improved from 45% in Line 1 to 61% in Line 2. The outcomes of this study can be used in the future planning of urban tunneling projects to estimate machine, staff, and logistic performance with the least possible error, and appropriately arrange the factors involved in the system.

Funder

Advanced Construction and Sustainable Futures research cluster at the School of Future Environment, Auckland University of Technology

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3