Abstract
We examine a uniform parallel machine scheduling problem with dedicated machines, job splitting, and limited setup resources for makespan minimization. In this problem, machines have different processing speeds, and each job can only be processed at several designated machines. A job can be split into multiple sections and those sections can be processed on multiple machines simultaneously. Sequence-independent setup times are assumed, and setup operations between jobs require setup operators that are limited. For the problem, we first develop a mathematical optimization model and for large-sized problems a constructive heuristic algorithm is proposed. Finally, we show that the algorithm developed is efficient and provides good solutions by experiments with various scenarios.
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献