Abstract
COVID-19 has posed challenges for the construction industry, such as precise pandemic control, sustainable labor relations, and loss minimization. In response to these challenges, this study has developed a decision model that optimizes workforce allocation for projects to achieve sustainable workforce management, a tradeoff between pandemic prevention and work resumption. The priority of project resumption was evaluated using basic characteristics, the long- and short-term strategies, and the regional pandemic situation. The energy level of skilled workers was graded according to construction team size, skill level, and experience. Sustainable allocation principles and paths were explored to target four different types of work resumption plans. We used the cellular automaton (CA) technique to simulate the sustainable allocation model. We also analyzed the similarity function of energy levels and the time-cost function of allocation. The case study of the SGJ Construction demonstrates that this allocation model can accurately simulate work resumption and provide a sustainable allocation decisions and tools under pandemic. Also, it implies balanced interests and concerns between construction companies and the society for work resumption during COVID-19.
Funder
Social Science Foundation of Shaanxi Province
New Urbanization Special Research Fund "COVID-19 Emergency Study" Special Project
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献