Abstract
Visions of energy transition focus on activating end users, meaning that numerous flexible-distribution network-level devices become active participants in power-system operations. This implies a fast, reliable, and secure exchange of data, enabling the distribution-system operators to maintain, or even improve, the quality and delivery of service. With the introduction of the International Electrotechnical Commission (IEC) 61850 standard, the path is set for a single communication topology covering all substation levels. The standard has the potential to change the way substations are designed, built, tested, and maintained. This means that the key segment of the substation, its protection system, will go through a transition period with the end goal of having a digitized substation where all information exchange is performed over an Ethernet communication bus. This paper analyzes the performance impact of the IEC 61850-9-2LE on the protection system. To do this, a laboratory hardware-in-the-loop test setup was developed representing traditional-, hybrid-, and digital-substation topology. The setup serves to simulate faults and create transient waveforms in an extended IEEE 123-node test system, which is then used to detect the reaction times of protection relay devices. To verify the results, a significant number of tests was performed clearly showing the benefits of digitalizing the distribution system.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献