Abstract
The Yamal peninsula is a territory of active industrial development as it contains several rich fields of natural condensed gas and oil. The density of the gullies net on the Yamal peninsula is one of the highest in the Russian Arctic. The natural environment or constructions can be potentially damaged by gully erosion and the cost of such damage is high. The models of gully erosion require surface runoff estimates. The hydrological model was developed for surface runoff estimation during the spring snow thaw and summer rains. In the conditions of Arctic climate with deep permafrost, the losses in runoff are limited to evaporation, as soil permeability is negligible. The model was calibrated on the available measurements. The meteorological base for hydrological calculations was ERA5 reanalysis, the fifth generation of European Centre for Medium-Range Weather Forecasts (ECMWF) atmospheric reanalyses, validated on the meteorological data. The deviations of reanalysis data from the measurements cause the errors in the results of surface runoff calculation. The daily surface runoff can vary in the range of 18–30% due to ERA5 errors in air temperature and snow cover depth. As the daily surface runoff is the main input to the models of gully erosion, these errors must be taken into account in the modelling of gully erosion on the Yamal peninsula.
Funder
Russian Foundation for Basic Research
Subject
Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry
Reference62 articles.
1. Nature of Yamal (Priroda Yamala),1995
2. The Role of Hydrocarbons in the Global Energy Agenda: The Focus on Liquefied Natural Gas
3. Scenarios for Russia's natural gas exports to 2050
4. Russian LNG: Becoming a Global Force. Working Paper;Henderson,2019
5. https://media-publications.bcg.com/SNAM-2019-GGR.pdf
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献