Decommissioning of Offshore Platforms in Adriatic Sea: The Total Removal Option from a Life Cycle Assessment Perspective

Author:

Colaleo Giuseppina,Nardo Federico,Azzellino AriannaORCID,Vicinanza DiegoORCID

Abstract

The international energy scenario to date is heavily based on fossil energy sources such as coal, oil or natural gas. According to the international ecological goals of the UNFCCC formalized in the legally binding treaty called the Paris Agreement, the next global challenges will be the decommissioning, dismantling or reconversion of the current fossil energy system into a new, more sustainable system that makes more efficient use of renewable energy technologies. Worldwide, there are about 6500 offshore oil and gas facilities and about 130 of them are located in the Mediterranean basin, mainly in the Adriatic and Ionian Seas: more than 110 offshore gas platforms have been installed in these areas since 1960. In this paper, using Life Cycle Assessment, the environmental and economic impacts of the total removal operations of an existing offshore platform in the context of the Adriatic Sea are assessed based on existing and registered decommissioning projects. In addition, the avoided impacts of primary steel production due to its recovery and recycling from the removed platform are assessed using the system boundary expansion method.

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction

Reference56 articles.

1. Reconversion of offshore oil and gas platforms into renewable energy sites production: Assessment of different scenarios;Leporini;Renew. Energy,2019

2. Comparing national environmental and economic performances through emergy sustainability indicators: Moving environmental ethics beyond anthropocentrism toward ecocentrism;Liu;Renew. Sustain. Energy Rev.,2016

3. ENI S.p.A. (2021, February 20). Valutazione Preliminare ai Sensi dell’art. 6, Comma 9, del d.lgs.152/2006 e ss.mm.ii., Relativa al Progetto di Decommissioning Della Piattaforma Denominata “Ada 3”, in Concessione di Coltivazione di Idrocarburi Liquidi e Gassosi “a.c9.ag.”, Available online: https://va.mite.gov.it/en-GB/Oggetti/Documentazione/7649/11092.

4. ENI S.p.A. (2021, June 22). Doc. 195/Presc—Studio di Fattibilità Decommissioning Bonaccia nw, Available online: https://va.mite.gov.it/it-IT/Oggetti/Documentazione/539/633.

5. Poremski, H.-J. (1998, January 4–7). Life Cycle Assessment—Development Planning through Decommissioning. Presented at the Offshore Technology Conference, Houston, TX, USA.

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3