Affiliation:
1. Key Laboratory of New Technology for Construction of Cities in Mountain Area, School of Civil Engineering, Chongqing University, Chongqing 400045, China
Abstract
Construction site layout planning (CSLP) that considers multi-objective optimization problems is essential to achieving sustainable construction. Previous CSLP optimization methods have applied to traditional cast-in-place buildings, and they lack the application for sustainable prefabricated buildings. Furthermore, commonly used heuristic algorithms still have room for improvement regarding the search range and computational efficiency of optimal solution acquisition. Therefore, this study proposes an improved multi-objective optimization and decision-making method for layout planning on the construction sites of prefabricated buildings (CSPB). Firstly, the construction site and temporary facilities are expressed mathematically. Then, relevant constraints are determined according to the principles of CSLP. Ten factors affecting the layout planning on the CSPB are identified and incorporated into the method of layout planning on the CSPB in different ways. Based on the elitist non-dominated sorting genetic algorithm (NSGA-II), an improved multiple population constraint NSGA-II (MPC-NSGA-II) is proposed. This introduces the multi-population strategy and immigration operator to expand the search range of the algorithm and improve its computational efficiency. Combined with the entropy weight and technique for order preference by similarity to an ideal solution (TOPSIS), improved multi-objective optimization and decision for the CSLP model is developed on the CSPB. Practical cases verify the effectiveness and superiority of the algorithm and model. It is found that the proposed MPC-NSGA-II can solve the drawbacks of the premature and low computational efficiency of NSGA-II for multi-constrained and multi-objective optimization problems. In the layout planning on the CSPB, the MPC-NSGA-II algorithm can improve the quality of the optimal solution and reduce the solution time by 75%.
Funder
111 project of the Ministry of Education and the Bureau of Foreign Experts of China
National Key R&D Program of the Ministry of Science and Technology
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction
Reference43 articles.
1. Contributions of the circular economy to the UN sustainable development goals through sustainable construction;Ogunmakinde;Resour. Conserv. Recycl.,2022
2. A Conceptual Framework for Collaborative Development of Intelligent Construction and Building Industrialization;Guo;Front. Environ. Sci.,2022
3. Xie, L., Chen, Y., and Chang, R. (2021). Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm. Appl. Sci., 11.
4. A BIM-Based Approach to Automated Prefabricated Building Construction Site Layout Planning;Yang;Ksce J. Civ. Eng.,2022
5. Integrating Hoisting Efficiency into Construction Site Layout Plan Model for Prefabricated Construction;Lu;J. Constr. Eng. Manag.,2021
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献