Facilitating Circular Transition in the Construction Industry: Optimizing a Prefabricated Construction Site Layout Using a Novel BIM-Integrated SLP-GA Model
-
Published:2024-09-09
Issue:9
Volume:14
Page:2841
-
ISSN:2075-5309
-
Container-title:Buildings
-
language:en
-
Short-container-title:Buildings
Author:
Wang Lin1, Wang Qi1, Dong Shuxiu1, Cao Yue2, Wang Liang3
Affiliation:
1. College of Civil Engineering and Transport, Beihua University, Jilin 132013, China 2. School of Economics and Management, Dalian University of Technology, Dalian 116024, China 3. International Business School, Hainan University, Haikou 570228, China
Abstract
Prefabricated construction is being developed as one of the pathways toward circularity in the construction industry. However, compared to traditional cast-in-place construction methods, the design of prefabricated construction site layouts presents unique challenges, such as managing the space for prefabricated components and lifting equipment, and coordinating the precise timing between off-site fabrication and on-site assembly. Existing research has primarily focused on traditional cast-in-place construction, leaving room for improvement in optimisation models for prefabricated site layouts. This study develops a BIM-based System Layout Planning-Genetic Algorithm (SLP-GA) model specifically tailored for prefabricated construction site optimisation. The proposed model improves the accuracy and visualisation of layout planning through BIM technology, enabling dynamic adjustments and real-time data integration. It also incorporates genetic algorithms to address complex multi-objective optimisation problems, avoiding local optima and overcoming the limitations of traditional SLP methods that rely on subjective judgements. Unlike previous studies that do not consider secondary handling, the optimisation objectives of this study focus on minimising material handling costs associated with secondary handling and maximising comprehensive relationships, including efficiency, safety and space utilisation. The application of this model in a case study shows a reduction in logistics costs of 8.58% and an improvement in comprehensive relationships of 11.61%, indicating significant improvements. This research advances optimisation methods for prefabricated construction site layouts, enriches optimisation objectives by considering secondary handling, and provides practical guidance for improving the efficiency and effectiveness of prefabricated construction projects.
Funder
the Jilin Provincial Department of Education
Reference24 articles.
1. Wang, H., Zhang, Y., Gao, W., and Kuroki, S. (2020). Life Cycle Environmental and Cost Performance of Prefabricated Buildings. Sustainability, 12. 2. Wu, H., Qian, Q.K., Straub, A., Visscher, H., and Zhuang, T. (2024). How Do Developers Influence the Transaction Costs of China’s Prefabricated Housing Development Process? An Investigation through the Bayesian Belief Network Approach. Systems, 12. 3. Ghufran, M., Khan, K.I.A., Ullah, F., Nasir, A.R., Alahmadi, A.A., Alzaed, A.N., and Alwetaishi, M. (2022). Closing the Loop in the Construction Industry: A Systematic Literature Review on the Development of Circular Economy. Buildings, 12. 4. Yao, G., Li, R., and Yang, Y. (2023). An Improved Multi-Objective Optimization and Decision-Making Method on Construction Sites Layout of Prefabricated Buildings. Sustainability, 15. 5. Site Layout Planning for Prefabricated Components Subject to Dynamic and Interactive Constraints;Zhang;Autom. Constr.,2021
|
|