Abstract
Among many factors that influence an excavator’s performance and productivity, the volume of the bucket load and duration of the excavator working cycle are crucial. In this paper, both factors were investigated, including the granulometric composition of the excavated material. The volume of material in the bucket was determined by photogrammetric analysis while the excavator cycle time was measured by analysis of video recordings captured by a digital video camera during the excavator operation. Interconnections between the angle of repose, slewing angle, particle size distribution of material, and their effects on hydraulic excavator productivity were analyzed. It was found that a larger number of fine particles in granular materials with a higher coefficient of uniformity resulted in an increase in the volume of the bucket load. Correlation analysis revealed significant interconnection between the bucket fill factor and swell factor. It was also found that calculation of the production rate according to ISO (International Organization for Standardization) standards was more accurate for materials with a higher angle of repose while the CECE (Committee for European Construction Equipment) standard was more appropriate for materials with lower angles of repose.
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献