Decision Making in the 4th Dimension—Exploring Use Cases and Technical Options for the Integration of 4D BIM and GIS during Construction

Author:

Liu Alyssa Huaqiu,Ellul ClaireORCID,Swiderska Monika

Abstract

In both the Geospatial (Geo) and Building Information Modelling (BIM) domains, it is widely acknowledged that the integration of geo-data and BIM-data is beneficial and a crucial step towards solving the multi-disciplinary challenges of our built environment. The result of this integration—broadly termed GeoBIM—has the potential to be particularly beneficial in the context of the construction of large infrastructure projects, which could make use of data relating to the larger spatial extents typically handled in geographical information systems (GIS) as well as the detailed models generated by BIM. To date, GeoBIM integration has mainly been explored for buildings, in a 3D context and for small projects. This paper demonstrates the results of the next level of integration, exploring the addition of the fourth dimension by linking project schedule information to create 4D GeoBIM, examining interoperability challenges and benefits in the context of a number of use cases relating to the enabling works for a major commercial infrastructure project. The integrating power of location and time—knowing where and when data relate to—allows us to explore data interoperability challenges relating to linking real world construction data, created using commercial software, with other data sources; we are then able to demonstrate the benefits of 4D GeoBIM in the context of three decision making scenarios: examining the potential for prioritisation of noise mitigation interventions by identifying apartments closest to the noisiest construction process; development of a 4D location-enabled risk register allowing, for example, work to continue underground if a risk is specific to the top of a building; ensuring construction safety by using 3D buffering to ensure that the required distances between moving construction equipment and surrounding infrastructure are not breached. Additionally, once integrated, we are able to ‘democratize’ the data—make it accessible beyond the BIM and GIS expert group—by embedding it into a 3D/4D open source Web GIS tool.

Publisher

MDPI AG

Subject

Earth and Planetary Sciences (miscellaneous),Computers in Earth Sciences,Geography, Planning and Development

Reference40 articles.

1. BIM Level 2 Benefits Measurement Application of PwC’s BIM Level 2 Benefits Measurement Methodology to Public Sector Capital Assets https://www.cdbb.cam.ac.uk/files/pwc_bmm_application_report_180607_final.pdf

2. BIM Levels Explained https://www.thenbs.com/knowledge/bim-levels-explained

3. Historic building information modelling (HBIM)

Cited by 11 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3