Optimizing a U-Shaped Conveyor Assembly Line Balancing Problem Considering Walking Times between Assembly Tasks

Author:

Kuo Yiyo1ORCID,Chen Ssu-Han1ORCID,Yang Taho2ORCID,Hsu Wei-Chen1

Affiliation:

1. Department of Industrial Engineering and Management, Ming Chi University of Technology, New Taipei City 243, Taiwan

2. Institute of Manufacturing Information and Systems, National Cheng Kung University, Tainan 701, Taiwan

Abstract

This research deals with a U-shaped assembly line balancing problem in which items are fixed on the conveyor. Operators execute the assembly tasks without removing items from the conveyor as the assembly items are assumed to be unsuitable for manual handling. The operators have to walk beside the conveyor at the same speed as the conveyor while they execute assembly tasks. If the operators want to assemble other items, they may have to walk to other positions at their normal walking speed. Therefore, the cycle time of an operator should include assembly times and walking times between assembly tasks. In this research, a mathematical model of the proposed U-shaped conveyor assembly line balancing problem was developed. Given a number of operators, the mathematical model can optimize the sequence of tasks and allocation of tasks to workstations using the commercial software LINGO 17. Because LINGO 17 requires a long computing time, simulated annealing (SA), which can accept worse new solutions in the search procedure, is proposed. The experimental results show that the proposed SA can optimize the problem efficiently.

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

Reference41 articles.

1. Tompkings, J.A., White, J.A., Bozer, Y.A., and Tanchoco, J.M.A. (2010). Facilities Planning, John Wiliey and Sons, INC.. [4th ed.].

2. Arnold, J.R.T., and Chapman, S.N. (2004). Introduction to Materials Management, Pearson Prentice Hall. [5th ed.].

3. Optimal control of operation efficiency of belt conveyor systems;Zhang;Appl. Energy,2010

4. A comparative study on the cost-effective belt conveyors for bulk material handling;Masaki;Energy Procedia,2017

5. A comparative evaluation of assembly line balancing heuristics;Ponnambalam;Int. J. Adv. Manuf. Technol.,1999

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3