1. Soumen Ghosh and Roger J. Gagnon, “A comprehensive literature review and analysis of the design, balancing and scheduling of assembly lines”, International Journal of Production Research, 27 (4), pp. 637–670, 1989.
2. Allan L., Gutjahr and George L. Nemhauser, “An algorithm for the line balancing problem”, Management Science, 11 (2), pp. 308–315, 1964.
3. W. P. Helgeson and D. P. Birnie, “Assembly line balancing using the ranked positional weight technique”, Journal of Industrial Engineering, 12(6), pp. 394–398, 1961.
4. M. D. Kilbridge and L. Wester, “A heuristic method of assembly line balancing”, Journal of Industrial Engineering, 12(4), pp. 292–298, 1961.
5. C. L. Moodie and H. H. Young, “A heuristic method of assembly line balancing for assumptions of constant or variable work element times”, Journal of Industrial Engineering, 16(1), pp. 23–29, 1965.