Abstract
Ore-based ironmaking generates a variety of residues, including slags and fines such as dust and sludges. Recycling of these residues within the integrated steel plant or in other applications is essential from a raw-material efficiency perspective. The main recycling route of off-gas dust is to the blast furnace (BF) via sinter, cold-bonded briquettes and tuyere injection. However, solely relying on the BF for recycling implicates that certain residues cannot be recycled in order to avoid build-up of unwanted elements, such as zinc. By introducing a holistic view on recycling where recycling via other process routes, such as the desulfurization (deS) station and the basic oxygen furnace (BOF), landfilling can be avoided. In the present study, process integration analyses were utilized to determine the most efficient recycling routes for off-gas dust that are currently not recycled within the integrated steel plants of Sweden. The feasibility of recycling was studied in experiments conducted in laboratory, pilot, and full-scale trials in the BF, deS station, and BOF. The process integration analyses suggested that recycling to the BF should be maximized before considering the deS station and BOF. The experiments indicated that the amount of residue that are not recycled could be minimized.
Subject
General Materials Science,Metals and Alloys
Reference33 articles.
1. An overview of utilization of slag and sludge from steel industries
2. Best Available Techniques (BAT) Reference Document for Iron and Steel Production;Rasmus,2013
3. Modern Blast Furnace Ironmaking: An Introduction;Geerdes,2015
4. Zinc accumulation during recycling of iron oxide wastes in the blast furnace
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献