Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects

Author:

Khahro Shabir Hussain1ORCID,Shaikh Haseeb Haleem2,Zainun Noor Yasmin2,Sultan Basel1ORCID,Khahro Qasim Hussain2

Affiliation:

1. Department of Engineering Management, College of Engineering, Prince Sultan University, Riyadh 11586, Saudi Arabia

2. Jamilus Research Center, Faculty of Civil Engineering & Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, Batu Pahat 86400, Malaysia

Abstract

The construction industry is one of the world’s fastest-growing industries, since it directly and indirectly contributes to several other industries. It has been observed that delays in the decision making of important stakeholders negatively impact construction projects. Thus, this has multiple consequences on project performance. Consequently, the purpose of this study was to identify the primary causes of delayed decision-making and offer a decision support model for timely construction project decisions. For factor identification, a comprehensive literature analysis was conducted, followed by an analysis of questionnaire responses of ninety-one professionals. For data analysis, the relative importance index (RII) method was applied. The results indicate that client decision-making delays pose a substantial obstacle for building projects. The early decision-making process is impacted by a lack of technical competence, incomplete paperwork, poor leadership, and coordination/communication issues. The proposed model could also assist project practitioners in improving their project decision making. This research study encourages stakeholders to create and implement an efficient decision-making procedure for timely project decisions. A procedure for decision making that is successful could decrease delays in the decision-making process and prevent conflicts and disputes in projects.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference82 articles.

1. Construction delay: A quantitative analysis;Int. J. Proj. Manag.,2000

2. The Predictability of Fast-Track Projects;Alhomadi;Procedia Eng.,2011

3. E-Business in Construction Industry: Opportunities and Challenges;Cherian;Indian J. Sci. Technol.,2016

4. Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects;Shrestha;J. Leg. Aff. Disput. Resolut. Eng. Constr.,2019

5. Causes and Effects of Delays in Large Construction Projects of Pakistan;Haseeb;Kuwait Chapter Arab. J. Bus. Manag. Rev.,2011

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3