Abstract
Coal-mining subsidence causes ground fissures and destroys surface structures, which may lead to severe casualties and economic losses. Time series interferometric synthetic aperture radar (TS-InSAR) plays an important role in surface deformation detection and monitoring without the restriction of weather and sunlight conditions. In addition, the probability integral method (PIM) is a surface movement model that is widely used in the field of mining subsidence. In recent years, the integration of TS-InSAR and the PIM has been extensively studied. In this paper, we propose a new method to estimate mining subsidence with the PIM based on TS-InSAR results. This study focuses on the improvement of a boundary constraint and dynamic parameter estimation in the PIM through the inversion of the line-of-sight (LOS) time series deformation derived by TS-InSAR. In addition, 45 Sentinel-1A images from 17 June 2015 to 27 December 2017 of a coal mine in Jiaozuo are utilized to acquire the surface displacement. We apply a time series deformation analysis using small baseline subsets (SBAS) and place the results into an improved PIM to estimate the mining parameters. The simulated mining subsidence is highly consistent with the leveling data, exhibiting an RMSE of 0.0025 m. Compared with the conventional method, the proposed method is more accurate in discovering displacement in mining areas. In the final section of this paper, some sources of error that affect the experiment are discussed.
Funder
National Natural Science Foundation of China
the science and technology project of State Grid
Subject
General Earth and Planetary Sciences
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献