Abstract
In this paper, we developed a control chart methodology for the monitoring the mean time between two events using the belief estimator under the neutrosophic gamma distribution. The proposed control chart coefficients and the neutrosophic average run length (NARL) have been determined using different process settings. The performance of the proposed chart is compared with the control chart under classical statistics in terms of NARL using the simulation data and real example. From comparisons, it is concluded that the proposed chart is efficient, effective and adequate to be used under uncertainty environment than the chart under classical statistics.
Subject
Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献