Affiliation:
1. Department of Statistics Quaid‐i‐Azam University Islamabad Pakistan
2. Department of Statistics Virginia Tech Blacksburg Virginia USA
Abstract
AbstractRecently, several control charts have been proposed in the statistical process monitoring literature based on a belief statistic. In this article we compare the zero‐state average run‐lengths and conditional expected delay profiles of the exponentially weighted moving average (EWMA) and belief statistic‐based (BSB) charts. We show that an ordinary EWMA chart is far better than the BSB chart when detecting delayed shifts in the mean of a normally distributed process.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献