Effects of Jack Thrust on the Damage of Segment Lining Structure during Shield Machine Tunnelling

Author:

Xu Ming1,Chen Dengkai1,Zhong Guang1,Liu Chuanxiang2,Li Huayun3,Zhang Zhiqiang2ORCID

Affiliation:

1. Nanchang Rail Transit Group Limited Corporation, Nanchang 330038, China

2. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China

3. School of Architecture and Civil Engineering, Xihua University, Chengdu 610039, China

Abstract

Constructing a tunnel with a large longitudinal slope and a small-radius sharp curve is challenging. During the construction process, it necessitates a series of intricate operations, including adjusting the horizontal and vertical posture of the shield machine, controlling the tunnelling thrust, and consistently ensuring the appropriate over-excavation amount inside and outside of the turn. Improper operations can easily induce undue stress on the segments. This study establishes a finite element numerical model of lining segments subjected to jacking force under various construction conditions. The concrete damage plasticity (CDP) constitutive model was used to characterize the mechanical behavior of concrete under load. The mechanical characteristics and damage behavior of segments under construction conditions, such as significant thrust escape, vertical attitude adjustment of the shield machine, excavation in soft and hard interbedded strata, line turning, sudden failure of the propulsion system, and eccentricity of brace boots, were analyzed. The results revealed that, when advancing according to the maximum thrust design value (50 MPa), cracks in the tensile plastic damage zone near the brace boot plate and the edges of the segment can develop. This can lead to localized corner failure of the concrete at the lining’s edge. Therefore, it is recommended that the jack’s thrust value should not surpass 30 MPa. Maintaining the usual uneven jack thrust state of shield tunnelling along the design axis is unlikely to result in segment concrete cracking. Damage to the segment caused by the eccentricity of the brace boot plate is the most severe; hence, avoiding the eccentricity of the brace boot plate during construction is crucial. The findings of this research can guide the control of jack thrust during shield tunnelling construction and offer insights into the design of segment parameters.

Funder

Science and Technology Program of Nanchang Rail Transit Group Limited Corporation of China

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference36 articles.

1. Munich’s second core S-Bahn route—Special geotechnical investigations for a challenging inner-city project;Fillibeck;Bauingenieur,2017

2. Hordijk, D., and Luković, M. (2018). High Tech Concrete: Where Technology and Engineering Meet, Springer.

3. Shield tunneling under railway station throats in soft soil areas: A case study;Liu;Adv. Civ. Eng.,2020

4. Analysis of ground settlement induced by small radius curve tunnel excavation considering shield articulation effect;Zhang;Rock Soil Mech.,2023

5. Lou, P., Li, Y., Xiao, H., Zhang, Z., and Lu, S. (2022). Influence of small radius curve shield tunneling on settlement of ground surface and mechanical properties of surrounding rock and segment. Appl. Sci., 12.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3