Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Conceptual Governance Framework

Author:

Hussain Osama A. I.1ORCID,Moehler Robert C.2ORCID,Walsh Stuart D. C.1,Ahiaga-Dagbui Dominic D.3

Affiliation:

1. Department of Civil Engineering, Faculty of Engineering, Monash University, Melbourne, VIC 3800, Australia

2. Department of Infrastructure Engineering, Faculty of Engineering and Information Technology, The University of Melbourne, Melbourne, VIC 3010, Australia

3. School of Architecture and Built Environment, Deakin University, Geelong, VIC 3220, Australia

Abstract

Integration of 5D Building Information Modeling (BIM) into large rail projects has the potential to significantly enhance cost management and control. Nevertheless, 5D-BIM implementation has encountered difficulties stemming from technical, functional, and governance-related factors. This paper builds a conceptual framework to support financial decision making, enhances project management, and promotes efficient project delivery. The framework encompasses a set of interrelated elements that include project governance, BIM policies and standards, digital platforms, BIM LOD, cost-estimation classification, and continuous improvement. The proposed framework acknowledges the significance of project governance in guiding and organizing the implementation of 5D-BIM. Additionally, BIM policies and standards ensure the adherence to quality standards for the produced BIM models. Digital platforms serve as the basis for multiple users to generate, access, share, and exchange project information. BIM LOD promotes collaboration and coordination among all project stakeholders. Cost-estimation classification aligns the estimation process with the development of project scope and financial decision making. Continuous improvement plays a vital role in optimizing processes, enhancing efficiency, and achieving higher-quality outcomes. Moreover, it fosters stakeholder satisfaction, improves project performance, and nurtures a conducive environment for innovation and learning. The study analyzes the framework utilization in Victorian rail projects and identifies key implementation challenges. The main technical hurdles encountered were the lack of current horizontal infrastructure standards for data exchange and the lack of compatibility with current cost-management standards. Increased project complexity and the absence of clear project governance strategies and processes also posed organizational challenges. A further validation of the framework in real-world rail projects was recommended to achieve the implementation goals.

Funder

Monash University Graduate Scholarship

Publisher

MDPI AG

Reference194 articles.

1. Hussain, O.A.I., Moehler, R.C., Walsh, S.D.C., and Ahiaga-Dagbui, D.D. (2023). Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Systematic Literature Review. Infrastructures, 8.

2. Megaprojects: Managing a Public Journey;Capka;Public Roads,2004

3. Ahmad, S., Algeo, C., Foster, S., Sohal, A., Prajogo, D., and Moehler, R. (2019, January 26–28). Review of the key challenges in major infrastructure construction projects: How do project managers ‘skill-up’?. Proceedings of the Annual Conference of the European Academy of Management 2019, Lisbon, Portugal.

4. Dynamics of stakeholder engagement in mega transport infrastructure projects;Erkul;Int. J. Manag. Proj. Bus.,2020

5. Five things you should know about cost overrun;Flyvbjerg;Transp. Res. Part A Policy Pract.,2018

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3