Estimation Method for an In Situ Stress Field along a Super-Long and Deep-Buried Tunnel and Its Application

Author:

Pei Qitao1,Wang Xiaonan12,He Lihong1,Liu Lu1,Tian Yong1,Wu Cai34ORCID

Affiliation:

1. Wuhan Municipal Engineering Design & Research Institute Co., Ltd., Wuhan 430023, China

2. Wuhan Urban Construction Investment Development Group Co., Ltd., Wuhan 430023, China

3. School of Civil Engineering, Hubei Engineering University, Xiaogan 432000, China

4. Changjiang River Scientific Research Institute of Changjiang Water Resources Commission, Wuhan 430010, China

Abstract

Aiming at some stress-induced failure phenomena in surrounding rock that occur during the construction of super-long and deep-buried tunnels, a method for estimating the in situ stress in the tunnels based on multivariate information integration is proposed, which uses a small amount of in situ stress measurement, stereographic projection technology, and a numerical simulation method. Firstly, by conducting a macroscopic analysis of the regional geological structure, topography, and pre-excavated small tunnels (such as exploration of adits and pilot tunnels), the strength of the tectonic stress field and the orientation of the principal stresses in the tunnel sections are preliminarily determined. Secondly, the reliability of the in situ stress measurement data were analyzed using full-space stereographic projection and the plane stress projection method. Then, some representative measurement points that reflected the distribution characteristics of in situ stress in the project area, on the whole, were determined. Thirdly, the finite difference (FDM) and multiple regression analysis (MRA) methods were used to inverse the in situ stress field in the project area. The proposed method was applied to a super-long and deep-buried tunnel project in Qinling, and the in situ stress distribution characteristics of the tunnel sections at different mileages were obtained. The results show that both the calculated principal stress values and the azimuth angle of the maximum horizontal principal stress are in good agreement with the measured ones, indicating that the method used in this study is reasonable. Finally, the typical surrounding rock failure phenomena encountered during the excavation of the project were investigated, and targeted treatment measures were proposed. The research results can provide references for support design and disaster management of surrounding rock in deep-buried long tunnels.

Funder

National Science Foundation of China

Central Non-profit Scientific Research Fund for Institutes of China

Key Project of the National Natural Science Foundation of China

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference43 articles.

1. Risk assessment using a new consulting process in fuzzy AHP;Lyu;J. Constr. Eng. Manag.,2020

2. Bayesian model selection for sand with generalization ability evaluation;Jin;Int. J. Numer. Anal. Methods Geomech.,2019

3. Optimization techniques for identifying soil parameters in geotechnical engineering: Comparative study and enhancement;Yin;Int. J. Numer. Anal. Methods Geomech.,2018

4. Cai, M.F. (2000). Principle and Techniques of In-Situ Stress Measurement, Science Press.

5. Back analysis study on initial geostress field of dam site for Xiluodu hydropower project;Fu;Chin. J. Rock Mech. Eng.,2006

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3