Author:
Li Jianfeng,Niu Dongxiao,Wu Ming,Wang Yongli,Li Fang,Dong Huanran
Abstract
Recently, integrated energy systems have become a new type of energy supply model. It is clear that integrated energy systems can improve energy efficiency and reduce costs. However, the use of a battery energy storage system (BESS) as a backup power source will affect the operating costs of a regional integrated energy system (RIES) in different situations. In this paper, a regional integrated energy system including wind turbines, photovoltaics, gas turbines and battery energy storage was introduced. In order to obtain the minimum operation cost, an operation optimization model was built. The schedule plans of each unit were optimized by a moth flame optimization (MFO) algorithm. Finally, three different scenarios were proposed for the simulation optimization. The simulation optimization results show that when the BESS is used as a backup power source, the operating cost of the system and the resulting pollutant emissions are less than the diesel generator (DG) set. Therefore, it is worthwhile to use BESS instead of DG as the backup power source in RIES.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献