Author:
Luo Chengwei,Luo Derong,Huang Shoudao,Wu Gongping,Zhu Hongzhang,He Qianjun
Abstract
The dc-link voltage balance and reactive power equilibrium of the cascaded H-bridge rectifier (CHBR) are the prerequisites for the safe and stable operation of the system. However, the conventional PI (Proportional-Integral) control strategy only puts emphasis on the CHBR dc-link voltage balance without taking into account its reactive power equilibrium under capacitive and inductive working conditions. For this reason, this paper has proposed a novel control strategy for the CHBR that can not only balance dc-link voltage, but also achieve reactive power equilibrium and eliminate the coupling effect between the voltage-balancing controller (VBC) and original system controller (OSC). The control strategy can achieve dc-link voltage balance and the reactive power equilibrium of the CHBR through modifying the active duty cycle by closed loop control, and adjusting the reactive duty cycle relatively according to the modifiable amount of the active duty cycle. Moreover, the strategy can eliminate the coupling effect between the VBC and OSC by the open loop control modification of the active and reactive duty cycle of any H-bridge module in CHBR. Simulations and experiments have shown that the proposed control strategy is feasible and effective in performing the CHBR dc-link voltage balance and reactive power equilibrium under all working conditions and load variations.
Funder
National Natural Science Foundation of China
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献