Abstract
This study investigates a two-stage assembly-type flow shop with limited waiting time constraints for minimizing the makespan. The first stage consists of m machines fabricating m types of components, whereas the second stage has a single machine to assemble the components into the final product. In the flow shop, the assembly operations in the second stage should start within the limited waiting times after those components complete in the first stage. For this problem, a mixed-integer programming formulation is provided, and this formulation is used to find an optimal solution using a commercial optimization solver CPLEX. As this problem is proved to be NP-hard, various heuristic algorithms (priority rule-based list scheduling, constructive heuristic, and metaheuristic) are proposed to solve a large-scale problem within a short computation time. To evaluate the proposed algorithms, a series of computational experiments, including the calibration of the metaheuristics, were performed on randomly generated problem instances, and the results showed outperformance of the proposed iterated greedy algorithm and simulated annealing algorithm in small- and large-sized problems, respectively.
Funder
National Research Foundation of Korea
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献