Abstract
In situ monitoring was conducted throughout the construction period to investigate the abnormal deformation of a bridge under construction subjected to sudden cooling by Typhoon Lekima. An FE model considering the temperature field based on measurement data was also established to reveal the exact causes of the bridge’s abnormal deformation and provide theoretical guidance for rehabilitation measures. The FE model simulation and measurement results showed that (1) the exact cause of the abnormal deformation of the bridge was the inconsistency of the temperature field between the top and bottom plates, and the sudden approach of the typhoon aggravated the inconsistency; (2) the abnormal deformation of the construction bridge caused by the typhoon could be addressed with rehabilitation before forming the bridge; (3) an extreme temperature field should be considered in the design of a beam–arch combination bridge. These results can provide a reference for the design and construction of similar bridges.
Funder
Youth Science Foundation of the Education Department of Jiangxi Province
National Natural Science Foundation of China
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference31 articles.
1. The Influence of Solar Radiation on the Bridge Structure;Kehlbeck,1981
2. Study on nonlinear influence of temperature on long-span steel cable-stayed bridge during construction;Hao;J. Highw. Transp. Res. Dev.,2013
3. Temperature Stresses in Composite Box Girder Bridges
4. Stress Analysis of Concrete Structures Subjected to Variable Thermal Loads
5. Temperature effects on cable stayed bridge using health monitoring system: a case study
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献