Affiliation:
1. Department of Management Systems and Organizational Development, Faculty of Computer Science and Management, Wrocław University of Science and Technology, 50-370 Wroclaw, Poland
2. Department of Economics, Management, Institutions, University of Naples Federico II, 83100 Naples, Italy
3. Department of Humanities, University of Naples Federico II, 83100 Naples, Italy
4. Department of Industrial Engineering, University of Naples Federico II, 83100 Naples, Italy
Abstract
The aim of the study was to assess the uncertainty scope and types present in public projects, with uncertainty defined as a lack of knowledge, and to formulate recommendations for improving the success rate of public projects. Apart from a literature review, a questionnaire was administered among 60 Italian and 40 Polish public-project managers. Questions about the level of knowledge of various project aspects (e.g., project stakeholders or project environment) in the project-planning phase were asked. It was found that, in their own opinion, knowledge of essential aspects of public projects in the planning stage was fairly low among public-project managers. On top of that, the results showed in which areas, and in which of the two countries, the uncertainty was mostly present. This type of research has not been identified in the literature. In both countries, an especially high uncertainty level characterized project stakeholders. The survey’s conclusions are juxtaposed with results from the literature: the negative influence of lack of knowledge (i.e., uncertainty) on project success, specific features of public projects and public-project managers, and the fact that certain negative phenomena influencing project success are significantly more present in the public than in the private sector. Our results indicate which aspects of public projects in both countries should be subject to deep changes—as far as information collecting and processing, in the project-defining and planning phase, is concerned. All this leads to recommendations of measures to be introduced in the public sector with respect to public-project management, e.g., the establishment of project management offices, project knowledge sharing, project management training—all focused on the identified uncertainty types in public projects, such as management of project stakeholders. The main limitations of the study were the relatively small sample sizes, a non-random sample selection, a bias due to misinterpretation of the questions, and cultural differences.
Subject
General Business, Management and Accounting
Reference63 articles.
1. Abeysekara, Baudhi (, January December). Application of Fuzzy Set Theory to Evaluate Large Scale Transport Infrastructure Risk Assessment and Application of Best Practices for Risk Management. Paper presented at IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Singapore.
2. Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project;Abeysekara;Research in Transportation Economics,2021
3. ‘Aggregation of factors causing cost overruns and time delays in large public construction projects’, Engineering, construction, and architectural management;Adam;Engineering, Construction and Architectural Management,2017
4. Ajam, Mounir A. (2020). Leading Megaprojects: A Tailored Approach, Auerbach Publications. [1st ed.].
5. Crafting project managers’ careers: Integrating the fields of careers and project management;Akkermans;Project Management Journal,2020
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. An Intelligent Based IoT System to Predict Proactive Paroxysms Using EDA Sensor;2024 7th International Conference on Devices, Circuits and Systems (ICDCS);2024-04-23
2. Business and Management Engineering;Springer Aerospace Technology;2024