Author:
Zheng Peng,Zhang Peng,Wang Ming,Zhang Jie
Abstract
The assembly job shop scheduling problem (AJSSP) widely exists in the production process of many complex products. Robust scheduling methods aim to optimize the given criteria for improving the robustness of the schedule by organizing the assembly processes under uncertainty. In this work, the uncertainty of process setup time and processing time is considered, and a framework for the robust scheduling of AJSSP using data-driven methodologies is proposed. The framework consists of obtaining the distribution information of uncertain parameters based on historical data and using a particle swarm optimization (PSO) algorithm to optimize the production schedule. Firstly, the kernel density estimation method is used to estimate the probability density function of uncertain parameters. To control the robustness of the schedule, the concept of confidence level is introduced when determining the range of uncertain parameters. Secondly, an interval scheduling method constructed using interval theory and a customized discrete PSO algorithm are used to optimize the AJSSP with assembly constraints. Several computational experiments are introduced to illustrate the proposed method, and these were proven effective in improving the performance and robustness of the schedule.
Funder
National Natural Science Foundation of China
National Key R&D Program of China
Fundamental Research Funds for the Central Universities
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献