A resilient scheduling framework for multi-robot multi-station welding flow shop scheduling against robot failures
-
Published:2025-02
Issue:
Volume:91
Page:102835
-
ISSN:0736-5845
-
Container-title:Robotics and Computer-Integrated Manufacturing
-
language:en
-
Short-container-title:Robotics and Computer-Integrated Manufacturing
Author:
Wang Ming,
Zhang PengORCID,
Zhang Guoqing,
Sun Kexin,
Zhang Jie,
Jin Mengyu
Reference48 articles.
1. Zhou, B., Zhou, R., Gan, Y., Fang, F., & Mao, Y. (2022). Multi-robot multi-station cooperative spot welding task allocation based on stepwise optimization: An industrial case study. Robotics and Computer-Integrated Manufacturing, 73, 102197. https://doi.org/10.1016/j.rcim.2021.102197.
2. A practical and synchronized data acquisition network architecture for industrial robot predictive maintenance in manufacturing assembly lines;Izagirre;Robot. Comput. Integr. Manuf.,2022
3. Resilience and stability of ecological systems;Holling;Annu Rev. Ecol. Syst.,1973
4. A landscape persistence-based methodological framework for assessing ecological stability;Lü;Environ. Sci. Ecotechnol.,2024
5. Resilience-oriented planning of integrated electricity and heat systems: A stochastic distributionally robust optimization approach;Zhou;Appl. Energy,2024