1. Solid waste paste filling for none-village-relocation coal mining;Zhou;J. China Univ. Min. Technol.,2004
2. Research on the width of filling body in gob-side entry retaining with high-water materials
3. Roof stability analyses of water-preserved and water-stored coal mining with construction backfill mining;Du;J. China Coal Soc.,2019
4. Determination and application of the backfill thickness in the residual ore recovery of crown and sill pillar;Xiuzhi;J. Min. Saf. Eng.,2016
5. The mechanical model for the paste false roof and finite element analysis;Wu;J. Min. Saf. Eng.,2017