1. Sustainable capacity of coalmining and its strategic plan;Xie;Eng Sci,2011
2. Mining anchor, excavation and anchor integration fast tunneling technology;Niu;Coal Eng,2004
3. Outlook on technology of quick tunneling;Yao;Min Process Equip,2004
4. Roof structure and control in the lower seam mining field in the ultra-close multiple seams;Zhu;J China Coal Soc,2010
5. In-situ observation on the floor-connected crack field and its effects on methane extraction;Qi;J China Coal Soc,2014