Research on Roof Load Transfer by Passing Coal Pillar of Working Face in Shallow Buried Closely Multiple-Seam

Author:

He YanpengORCID,Huang Qingxiang,Wei Yehao,Du Junwu

Abstract

The dynamic load effect of supports is mainly caused by the movement of the roof structure and the load transfer of overburden. In view of the practice issue that the phenomenon of strong ground pressure is easy to happen, when the working face of the lower coal seam passes the inclined coal pillar in shallow buried closely multiple-seam, it will lead to supprot damaged. This paper takes the mining of over-inclined coal pillars in the 22410 working face of the Bulianta Coal Mine as the background, based on the research method combining the field measurement, physical simulation experiment, and numerical calculation, the evolution law of the front abutment pressure (FAP) and roof weighting in mining under the inclined coal pillar is analyzed, and the mechanism of the stress transfer of the inclined coal pillar and the dynamic load of the support is revealed. The research shows that the concentrated stress of the coal pillar is jointly borne by the front coal wall of the working face and the interburden structure above the support. The vertical stress transmitted from the coal pillar to the floor acts on the key blocks of the interburden of the lower coal seam, which causes strong pressure and dynamic load effect, such as roof structure cut-off. The periodic breaking of the key stratum of the interburden leads to the development height and range of the cracks increasing stepwise. The partition characteristics of the mutual transformation of the interburden stress, the FAP, and the working resistance (WR) by passing the coal pillar stage are revealed, which is divided into three stages and four regions. With the working face passing through the inclined coal pillar, the influence area of the concentrated stress of the coal pillar is reduced, and the peak stress of the coal pillar is gradually transferred to the outside of the coal pillar. When the working face is 5 m away from the coal pillar, the peak of FAP and WR reaches the maximum values, the roof is cutting along the peak stress line, and the working face has a strong weighting phenomenon. The research results are consistent with the field measurement results, providing a reference for the mining of working faces under similar conditions.

Funder

National Natural Science Foundation of China

Natural Science Basic Research Program of Shaanxi

Publisher

MDPI AG

Subject

Geology,Geotechnical Engineering and Engineering Geology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3