Abstract
Increasing needs for taller wind turbines with bigger capacities, intended for places with high wind velocities or at higher altitudes, have led to new technologies in the wind energy industry. A recently introduced structural system for onshore wind turbine towers is the hybrid steel tower. Comprehension of the environmental response of this hybrid steel structural system is warranted. Even though life cycle assessments (LCAs) for conventional wind turbine tubular towers exist, the environmental performance of this new hybrid structure has not been reported. The present paper examines the LCA of 185 m tall hybrid towers. Considerations made for the LCA procedure are meticulously described, including particular attention at the erection and transportation stage. The highest environmental impacts arise during the manufacturing stage followed by the erection stage. The tower is the component with the largest carbon emissions and energy requirements. The obtained LCA footprints of hybrid towers are also compared to the literature data on conventional towers, resulting in similar environmental impacts.
Funder
Research Fund for Coal and Steel
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
31 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献