Abstract
Three-dimensional block models are the most frequently used tool for estimating mineral resources and reserves within a mineral deposit. In open pit mining, the basis of mine design and the long term mining schedule is calculation of the ultimate pit limit. The ultimate pit limit is the pit with the highest profit value. Over the years, different algorithms have been developed that enable us to calculate the final pit: floating or mobile cone, floating cone II and its corrected forms, floating cone III, the Korobov algorithm and its corrected form, the Lerchs–Grossmann 2D algorithm (dynamic programming), and the Lerchs–Grossmann 3D algorithm (graph theory). All these algorithms have advantages and disadvantages. The floating cone method stands out for its simplicity, speed, and easy implementation, even for calculating a pit with a variable slope angle. The main drawback of this method is that it is unable to examine all possible combinations. For this reason, the algorithm does not consistently give optimal results, which is why it has required improvements over time. However, the improved methods still have some problems. To overcome these problems, a new algorithm called the floating cone IV method will be demonstrated in this paper.
Subject
Geology,Geotechnical Engineering and Engineering Geology
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献