Identification of Factors Affecting the Performance of Rural Road Projects in Colombia

Author:

Gómez-Cabrera AdrianaORCID,Sanz-Benlloch AmaliaORCID,Montalban-Domingo LauraORCID,Ponz-Tienda Jose LuisORCID,Pellicer EugenioORCID

Abstract

Rural roads play an indispensable role in economic and social well-being, especially in developing countries, contributing to achieving the Sustainable Development Goals. For this reason, it is necessary to plan these projects properly to guarantee their success. In this line, the objective of this research is to identify significant variables generating overruns in time and cost using empirical data of 535 rural road projects in Colombia from 2015 to 2018. Bivariate analysis, with statistical tools like Spearman’s Rho and Kruskal–Wallis, allowed identifying that higher values of variables like budget and project intensity are related to higher deviations in cost and time. Additionally, it was found that projects with shorter durations are reporting higher time overruns. The worst performers are projects executed in the year that council mayors start their terms, those developed in municipalities with more resources, and those awarded using a competitive bidding process. Multivariate analysis, through Random Forest, assessed the effect of considering all variables interacting simultaneously and ranking them in order of importance. The results demonstrated a relationship between cost and time performance, and that numerical variables are more significant than the categorical ones. This study contributes to a better understanding of the causes of delays and cost overruns on rural roads, providing useful insight for researchers and industry practitioners.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development

Reference52 articles.

1. Sustainable Rural Development under Agenda 2030;Mihai,2020

2. http://www.slocat.net/wp-content/uploads/legacy/u15/contribution_of_rural_transport_to_the_sustainable_development_goals_paper_final.pdf

3. The evidence for rural road technology in low-income countries

4. Rethinking Rural Road Infrastructure Delivery

5. FUNDACION PAZ Y RECONCILIACIONhttps://pares.com.co/2016/07/28/las-vias-terciarias-del-postconflicto/

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Analysis of delays and cost overruns of road construction projects in the Colombian Caribbean Region;Bulletin of Geography. Socio-economic Series;2023-09-28

2. Causes of time and cost overruns in construction projects: a scoping review;International Journal of Construction Management;2023-09-12

3. The entanglement of time and cost deviations in public projects;Annals of Public and Cooperative Economics;2021-12-15

4. Distributed Assignment with Energy Constraints of a UAV fleet for Resource Distribution;2021 IEEE 5th Colombian Conference on Automatic Control (CCAC);2021-10-19

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3