Abstract
Construction projects are constantly threatened by delays and cost overruns that might compromise their viability. Th us, identifying the leading causes of these issues based on the experience of experienced professionals is essential to planning and reducing these risks. This research evaluates the frequency and severity of variables causing delays and cost overruns in Colombian Caribbean Region road projects. Th e nine causes studied in this research were defined through a literature review, preliminary discussion and a pilot test. A survey directed to 42 road construction engineers allowed the authors to characterise these professionals’ perceptions regarding the frequency and severity of these variables in terms of delay and cost overruns, with a confi dence level of 80%. Statistical analyses were applied to the results of the survey to establish which variables generate the most signifi cant impacts when building roads and related works in the Colombian Caribbean Region
Publisher
Uniwersytet Mikolaja Kopernika/Nicolaus Copernicus University
Subject
Urban Studies,Cultural Studies,Geography, Planning and Development,Demography
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献