Abstract
During drilling of petroleum or geothermal wells, unforeseen circumstances occasionally happen that require suspension of the operation. When the drilling fluid is left in a static condition, solid material like barite may settle out of the fluid. Consequently, the induced hydrostatic pressure that the fluid exerts onto the formation will be reduced, possibly leading to collapse of the borehole or influx of liquid or gas. A possible mitigation action is placement of a gel pill. This gel pill should preferably be able to let settled barite rest on top of it and still transmit the hydrostatic pressure to the well bottom. A bentonite-based gel pill is developed, preventing flow of higher density drilling fluid placed above it to bypass the gel pill. Its rheological behavior was characterized prior to functional testing. The designed gel pill develops sufficient gel structure to accommodate the settled barite. The performance of the gel was tested at vertical and 40° inclination from vertical. Both conventional settling and the Boycott effect were observed. The gel pill provided its intended functionality while barite was settling out of the drilling fluid on top of this gel pill. The barite was then resting on top of the gel pill. It is demonstrated that a purely viscous pill should not be used for separating a high density fluid from a lighter fluid underneath. However, a bentonite or laponite gel pill can be placed into a well for temporary prevention of such intermixing.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献