Dependence of Total Production Costs on Production and Infrastructure Parameters in the Polish Hard Coal Mining Industry

Author:

Jonek-Kowalska Izabela,Turek Marian

Abstract

European hard coalmining is a declining industry, despite the use of hard coal for energy in several countries. Industry restructuring and public subsidies have failed to stop this industry’s decline. The largest hard coalmining sector, the Polish sector, has faced an obstacle to its survival: How to reduce production costs to compete with less expensive imported hard coal? This article aims to identify and analyze the dependence of the total production costs representing production and infrastructure parameters of the Polish hard coalmining industry. The parameters are divided into three groups: (1) the cost of employees and the production volume; (2) the number of longwalls, the length of a longwall, the daily longwall advance and the preparatory work advance; and (3) the number of levels in exploitation, the number of layers in exploitation and the number of shafts. The findings indicate that, even in well-functioning coalmines, there are many economically irrational relationships, especially regarding employment and infrastructure size. This study shows that employment, which is a significant cost component of the production and infrastructure parameters of the examined Polish hard coalmines, is not economically rational in terms of its proportion to the total production costs. As a result, even a considerable reduction in employment or infrastructure does not influence the unit costs of mining production, which could only be partially explained by the high level of fixed costs. There are also no appropriate relationships between infrastructure parameters and the total production cost. Under these irrational conditions, a reduction in the production costs of hard coalmining enterprises is difficult, but unproductive costly activities could prevent an improvement in production efficiency. Only restoring the proper relationship between economic and infrastructure parameters and the total production costs can ensure a return to price competitiveness. Those actions are crucial for the Polish hard coalmining industry, because the research focused on successful hard coalmines that were not declining indicate it should be able to implement cost improvements.

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)

Reference74 articles.

1. The cost of capital in the effectiveness assessment of financial management in a company

2. The use of fuzzy logic in the enterprises business efficiency assessment;Nawrocki,2015

3. Efektywność—Ujęcie ekonomiczne i społeczne;Zieliński;Zesz. Naukowe Politech. Śląskiej Ser. Organ. Zarz.,2013

4. European economies in terms of energy dependence

5. Application of set pair analysis method on occupational hazard of coal mining

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3