Planning an Integrated Stockyard–Port System for Smart Iron Ore Supply Chains via VND Optimization

Author:

Lopes Álvaro D. O.1,Rocha Helder R. O.1ORCID,Servare Junior Marcos W. J.12ORCID,Moraes Renato E. N.2ORCID,Silva Jair A. L.13ORCID,Salles José L. F.1

Affiliation:

1. Department of Electrical Engineering, Federal University of Espírito Santo, Av. Fernando Ferrari, 514, Vitória 29075-910, ES, Brazil

2. Department of Industrial Engineering, Federal University of Espírito Santo, Av. Fernando Ferrari, 514, Vitória 29075-910, ES, Brazil

3. Sensors and Smart Systems Group, Institute of Engineering, Hanze University of Applied Sciences, 9747 AS Groningen, The Netherlands

Abstract

Stockyard–port planning is a complex combinatorial problem that has been studied primarily through simulation or optimization techniques. However, due to its classification as non-deterministic polynomial-time hard (NP-hard), the generation of optimal or near-optimal solutions in real time requires optimization techniques based on heuristics or metaheuristics. This paper proposes a deterministic simulation and a meta-heuristic algorithm to address the stockyard–port planning problem, with the aim of reducing the time that ships spend in berths. The proposed algorithm is based on the ore handling operations in a real stockyard–port terminal, considering the interaction of large physical equipment and information about the production processes. The stockyard–port system is represented by a graph in order to define ship priorities for planning and generation of an initial solution through a deterministic simulation. Subsequently, the Variable Neighborhood Descent (VND) meta-heuristic is used to improve the initial solution. The convergence time of VND ranged from 1 to 190 s, with the total number of ships served in the berths varying from 10 to 1000 units, and the number of stockyards and berths varying from 11 to 15 and 3 to 5, respectively. Simulation results demonstrate the efficiency of the proposed algorithm in determining the best allocation of stockpiles, berths, car-dumpers, and conveyor belts. The results also show that increasing the number of conveyor belts is an important strategy that decreases environmental impacts due to exposure of the raw material to the atmosphere, while also increasing the stockyard–port productivity. This positive impact is greater when the number yards and ship berths increases. The proposed algorithm enables real-time decision-making from small and large instances, and its implementation in an iron ore stockyard–port that uses Industry 4.0 principles is suitable.

Funder

FAPES

CNPq

FAPES and Vale Company in Brazil

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference36 articles.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3