Influence of the Parameters of an Agricultural Biogas Plant on the Amount of Power Generated

Author:

Kuboń Maciej12ORCID,Skibko Zbigniew3ORCID,Borusiewicz Andrzej4ORCID,Romaniuk Wacław5,Gajda Jakub St.1,Kłosowska Olivia6,Wasąg Zbigniew7

Affiliation:

1. Department of Production Engineering, Logistics and Applied Computer Science, Faculty of Production and Power Engineering, University of Agriculture in Krakow, Balicka 116B, 30-149 Krakow, Poland

2. Faculty of Technical Sciences and Design Arts, National Academy of Applied Sciences in Przemyśl, Książąt Lubomirskich 6, 37-700 Przemyśl, Poland

3. Faculty of Electrical Engineering, Bialystok University of Technology, Wiejska 45, 15-351 Bialystok, Poland

4. Department of Agronomy, Modern Technology and Informatics, International Academy of Applied Sciences in Lomza, 18-402 Lomza, Poland

5. Institute of Technology and Life Sciences—National Research Insitute, Hrabska 3, 05-090 Falenty, Poland

6. Faculty of Environmental Engineering and Land Surveying, University of Agriculture in Krakow, Al. Mickiewicza 24/28, 30-059 Krakow, Poland

7. Department of Administration, Jan Zamoyski College of Humanities and Economics in Zamość, Ul. Koszary 8, 22-400 Zamość, Poland

Abstract

Energy from biogas is widely available, inexpensive, and often contributes to waste management, making it one of the most promising renewable energy sources. The main factors influencing this process’ efficiency include the substrates’ chemical composition, temperature, and digester load. This paper presents the possibilities offered by a biogas plant built at a farm specialising in dairy cows. The dependence of the power generated in the micro biogas plant on its technical parameters was analysed in detail. Studies carried out by the authors in an agricultural microgas plant (with an electrical output of 40 kW) have shown that they are designed to maintain continuous energy production, despite changing process parameters such as digester mass level, biogas height, temperature or slurry flow into the digester. However, from the point of view of the amount of electricity generated, changes would have to be made to the design of the biogas plant. Firstly, a more powerful generator would have to be installed to cover the electricity requirements of the equipment installed in the biogas plant so that power close to the rated capacity of the biogas plant is still sent to the grid. Secondly, replacing the two existing agitators of the digestion mass (9 kW each) with more agitators of lower power (e.g., four agitators of 4.5 kW each) would be necessary. These should be programmed so that one of the agitators operates at any given time (the operating time of a given agitator should depend on the composition of the digestate).

Publisher

MDPI AG

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3